Bedford Bandstand
Overview
Our client was instructed by the council to safely remove and dispose of the high levels of led content to the railings and ceiling of the Bedford Bandstand. Due to the high content of levels of led, our client had to create a fully sealed enclosure to ensure the hazardous levels of led was not released to the public area.
MBM were tasked to create a safe working platform to ensure the site workers had safe and easy access to the affected areas.
We’re pleased to say that our feedback from our client was positive, with the workers having great access to the areas. In addition to this, all works were carried out to the agreed budget, programme and quality of works.
Health and safety
Health and Safety is obviously our number one priority and it is refreshing to work with a subcontractor who have the same vision and goal. Brogan Group have a very proactive approach to Health and Safety which to a main contractor is very refreshing.
View More Case Studies
Industrial
Ferrybridge Power Station
MBM Scaffold completed the safe erection and dismantling of the required scaffold works to a Turbine located within a Power Station in West Yorkshire. The scaffold span approximately 200m high and 10m wide.
Petrochemical
Sabic Petrochemical Plant
MBM Scaffolding were instructed to safely erect and dismantle the scaffold to the ‘EB Column’ at a Petrochemical Plant based in Middlesbrough.
Industrial
Lostock
MBM Scaffold completed the safe erection and dismantling of scaffolding required to access high level pipework identified on the ‘Foremans Bridge’ at an industrial site based in Lostock, Greater Manchester.