Fawley Power Station
Overview
We are pleased to share some progress and completion pictures from a recently finished project down in sunny Southampton.
Scope of works include:
· x1 external birdcage.
· x1 internal birdcage.
· x2 internal scaffold towers at 7.5m.
· x2 internal scaffold towers at 6m.
· x2 internal scaffold towers at 4m.
The various sizes in internal scaffold towers where required to create safe acces to the dome shaped ceiling.
Health and safety
Health and Safety is obviously our number one priority and it is refreshing to work with a subcontractor who have the same vision and goal. Brogan Group have a very proactive approach to Health and Safety which to a main contractor is very refreshing.
View More Case Studies
Industrial
Ferrybridge Power Station
MBM Scaffold completed the safe erection and dismantling of the required scaffold works to a Turbine located within a Power Station in West Yorkshire. The scaffold span approximately 200m high and 10m wide.
Petrochemical
Sabic Petrochemical Plant
MBM Scaffolding were instructed to safely erect and dismantle the scaffold to the ‘EB Column’ at a Petrochemical Plant based in Middlesbrough.
Industrial
Lostock
MBM Scaffold completed the safe erection and dismantling of scaffolding required to access high level pipework identified on the ‘Foremans Bridge’ at an industrial site based in Lostock, Greater Manchester.