MBM Scaffold completed the safe erection and dismantling of the required scaffold works to a Turbine located within a Power Station in West Yorkshire. The scaffold span approximately 200m high and 10m wide.
The scaffold was required to enable safe access to the Turbine as part of the Power Station decommissioning works.
We are please to say that the works were carried out in a safe manner, with 0 incidences recorded.