Ferrybridge Power Station

Overview

MBM Scaffold completed the safe erection and dismantling of the required scaffold works to a Turbine located within a Power Station in West Yorkshire. The scaffold span approximately 200m high and 10m wide.

The scaffold was required to enable safe access to the Turbine as part of the Power Station decommissioning works.

We are please to say that the works were carried out in a safe manner, with 0 incidences recorded.

Ferry-Turbine
HEALTH AND SAFETY
Health and Safety is obviously our number one priority and it is refreshing to work with a subcontractor who have the same vision and goal. Brogan Group have a very proactive approach to Health and Safety which to a main contractor is very refreshing.andard and over 20 years’ experience.

Health and safety

 Health and Safety is obviously our number one priority and it is refreshing to work with a subcontractor who have the same vision and goal. Brogan Group have a very proactive approach to Health and Safety which to a main contractor is very refreshing.

View More Case Studies

EB-Column

Petrochemical

Sabic Petrochemical Plant

MBM Scaffold completed the safe erection and dismantling of scaffolding required to access high level pipework identified on the ‘Foremans Bridge’ at an industrial site based in Lostock, Greater Manchester.

Bedford-Bandstand

Commercial

Bedford Bandstand

Our client was instructed by the council to safely remove and dispose of the high levels of led content to the railings and ceiling of the Bedford Bandstand.

Lostock-2

Industrial

Lostock

MBM Scaffold completed the safe erection and dismantling of scaffolding required to access high level pipework identified on the ‘Foremans Bridge’ at an industrial site based in Lostock, Greater Manchester.

MBM Scaffolding LTD. provide scaffolding solutions for medium to large scale construction projects.

System
Scaffolding

Staircases

Tube & 
Fitting

Temporary
Roof

PHONE NUMBER
01462 418 814 

WRITE TO US
info@mbmscaffolding.co.uk