Overview
MBM Scaffold completed the safe erection and dismantling of scaffolding required to access high level pipework identified on the ‘Foremans Bridge’ at an industrial site based in Lostock, Greater Manchester.
Specialist Scaffold Designs were required to ensure the weight loadings of the scaffold were safely supported.
A superb job well done by the MBM Scaffold team.
Health and safety
Health and Safety is obviously our number one priority and it is refreshing to work with a subcontractor who have the same vision and goal. Brogan Group have a very proactive approach to Health and Safety which to a main contractor is very refreshing.
View More Case Studies
Industrial
Ferrybridge Power Station
MBM Scaffold completed the safe erection and dismantling of the required scaffold works to a Turbine located within a Power Station in West Yorkshire. The scaffold span approximately 200m high and 10m wide.
Petrochemical
Sabic Petrochemical Plant
MBM Scaffolding were instructed to safely erect and dismantle the scaffold to the ‘EB Column’ at a Petrochemical Plant based in Middlesbrough.
Commercial
Bedford Bandstand
Our client was instructed by the council to safely remove and dispose of the high levels of led content to the railings and ceiling of the Bedford Bandstand.