MBM Scaffolding completed the safe erection of scaffolding around the perimeter of Pilgrim Hospital, Boston, Lincolnshire.
Additional access equipment fixed to the scaffolding included:
· x2 Haki staircases.
· x2 2T Passenger and goods hoist.
· Provision of generators to power hoists.
The scaffolding was built in a bespoke manner to form the frame of asbestos enclosures works, which is leading to the overall refurbishment project of the hospital. The refurbishment work is to the Maternity ward with the aim of creating a more dynamic and adaptable environment for patients.
Needless to say, all scaffolding works were completed to the satisfaction of our client and the hospital.
Health and safety
Health and Safety is obviously our number one priority and it is refreshing to work with a subcontractor who have the same vision and goal. Brogan Group have a very proactive approach to Health and Safety which to a main contractor is very refreshing.
View More Case Studies
Industrial
Ferrybridge Power Station
MBM Scaffold completed the safe erection and dismantling of the required scaffold works to a Turbine located within a Power Station in West Yorkshire. The scaffold span approximately 200m high and 10m wide.
Petrochemical
Sabic Petrochemical Plant
MBM Scaffolding were instructed to safely erect and dismantle the scaffold to the ‘EB Column’ at a Petrochemical Plant based in Middlesbrough.
Industrial
Lostock
MBM Scaffold completed the safe erection and dismantling of scaffolding required to access high level pipework identified on the ‘Foremans Bridge’ at an industrial site based in Lostock, Greater Manchester.