MBM Scaffolding were instructed to safely erect and dismantle the scaffold to the ‘EB Column’ at a Petrochemical Plant based in Middlesbrough.
MBM progressively wrapped the column in Monarflex every 5 lifts, working from top down. This was required after taking into consideration the wind loading calculations. As the refurbishment works progressed downwards, MBM progressed with the Monarflex sheeting to create a safe working environment for our client.